United States › Grid › Interconnection queues › Massachusetts

GAS · ISO-NE

Combined cycle (alt to Q442/472)

Combined cycle (alt to Q442/472) is a 431 MW gas request withdrawn in the ISO-NE interconnection queue, in Hampden County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2015 (completed)
  2. Withdrawn / abandonedFeb 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
541
Grid region
ISO-NE (New England)
Connection point (POI)
115kV Line 1302 between Buck Pond and Pochassic substations, approximately 1 mile south of Buck Pond
Location
Hampden County, Massachusetts
Technology
Gas: 431 MW · Oil
Total requested
431 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
2 March 2015
Proposed online date
March 2019
Withdrawn
February 2016

Location

Marker shows the centre of Hampden County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Hampden County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem