United States β€Ί Grid β€Ί Interconnection queues β€Ί Massachusetts

GAS Β· ISO-NE

Combined Cycle

Combined Cycle is a 388 MW gas request withdrawn in the ISO-NE interconnection queue, in Hampden County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2014 (completed)
  2. Withdrawn / abandonedDec 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
442
Grid region
ISO-NE (New England)
Connection point (POI)
115kV Line 1302 between Buck Pond and Pochassic substations, approximately 1 mile south of Buck Pond.
Location
Hampden County, Massachusetts
Technology
Gas: 388 MW Β· Oil
Total requested
388 MW
Service type
Network resource (NRIS)
Study phase
In Progress
Queue status
Withdrawn
Entered queue
26 February 2014
Proposed online date
March 2019
Withdrawn
December 2015

Location

Marker shows the centre of Hampden County; the queue data does not give exact sites.

Power plants in Massachusetts Β· Transmission lines in Massachusetts

Other requests in Hampden County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem