United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in ISO-NE (New England) (2017 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Offshore Wind w/ battery storage Other |
880 MW | Withdrawn / abandoned |
| Wind Onshore wind |
630 MW | Withdrawn / abandoned |
| Offshore Wind Offshore wind |
400 MW | Withdrawn / abandoned |
| Gas Turbine Repowering Gas |
378 MW | Withdrawn / abandoned |
| Offshore Wind Offshore wind |
288 MW | Withdrawn / abandoned |
| Battery storage addition (see Q663) Wind + storage |
266 MW | Withdrawn / abandoned |
| Wind Onshore wind |
241 MW | Withdrawn / abandoned |
| battery storage additional (see Q664) Wind + storage |
239 MW | Withdrawn / abandoned |
| Wind Onshore wind |
214 MW | Withdrawn / abandoned |
| Wind Onshore wind |
150 MW | Withdrawn / abandoned |
| Solar Solar |
150 MW | Withdrawn / abandoned |
| Energy Storage Battery storage |
150 MW | Withdrawn / abandoned |
| Energy Storage Battery storage |
100 MW | Withdrawn / abandoned |
| Energy Storage Battery storage |
100 MW | Withdrawn / abandoned |
| Offshore Wind with battery addition Other |
75.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
65.6 MW | Withdrawn / abandoned |
| Energy Storage Battery storage |
50.0 MW | Withdrawn / abandoned |
| Repowering Increase Gas |
34.8 MW | Withdrawn / abandoned |
| Solar Solar |
30.0 MW | Withdrawn / abandoned |
| Solar Solar |
26.0 MW | Withdrawn / abandoned |
| Gas turbine repowering Gas |
23.0 MW | Withdrawn / abandoned |
| Solar Solar |
22.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.1 MW | Withdrawn / abandoned |
| Solar Solar |
20.1 MW | Withdrawn / abandoned |
| Solar Solar |
20.1 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| solar with battery Solar + storage |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Claremont Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| wind Onshore wind |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| CHP Gas |
8.0 MW | Withdrawn / abandoned |
| Solar Solar |
7.0 MW | Withdrawn / abandoned |
| Solar Solar |
6.1 MW | Withdrawn / abandoned |
| Project Increase Other |
2.2 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)302 Β· 46.9 GW
- SPP (Southwest Power Pool)162 Β· 32.0 GW
- MISO (Midcontinent)127 Β· 19.9 GW
- PJM (Mid-Atlantic, Midwest)236 Β· 18.3 GW
- Southeast (non-ISO utilities)208 Β· 16.9 GW
- CAISO (California)65 Β· 11.3 GW
- ERCOT (Texas)55 Β· 8,908 MW
- ISO-NE (New England)42 Β· 4,856 MW
- NYISO (New York)61 Β· 2,565 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)