OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in ISO-NE (New England) (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown424,856 MW
Active in queue831 MW3 requests
Agreement signed831 MW3 requests
Withdrawn424,856 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

42 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Offshore Wind w/ battery storage
Other
880 MWWithdrawn / abandoned MAISO-NE Apr 2017target 2024
Wind
Onshore wind
630 MWWithdrawn / abandoned Aroostook, MEISO-NE Jul 2017target 2022
Offshore Wind
Offshore wind
400 MWWithdrawn / abandoned MAISO-NE Dec 2017target 2023
Gas Turbine Repowering
Gas
378 MWWithdrawn / abandoned Middlesex, CTISO-NE Apr 2017target 2021
Offshore Wind
Offshore wind
288 MWWithdrawn / abandoned MAISO-NE Jul 2017target 2023
Battery storage addition (see Q663)
Wind + storage
266 MWWithdrawn / abandoned Franklin, MEISO-NE Jul 2017target 2020
Wind
Onshore wind
241 MWWithdrawn / abandoned Franklin, MEISO-NE Jul 2017target 2020
battery storage additional (see Q664)
Wind + storage
239 MWWithdrawn / abandoned Franklin, MEISO-NE Jul 2017target 2020
Wind
Onshore wind
214 MWWithdrawn / abandoned Franklin, MEISO-NE Jul 2017target 2020
Wind
Onshore wind
150 MWWithdrawn / abandoned Franklin, MEISO-NE Jul 2017target 2022
Solar
Solar
150 MWWithdrawn / abandoned Somerset, MEISO-NE Jul 2017target 2020
Energy Storage
Battery storage
150 MWWithdrawn / abandoned Barnstable, MAISO-NE Nov 2017target 2021
Energy Storage
Battery storage
100 MWWithdrawn / abandoned Middlesex, MAISO-NE Nov 2017target 2023
Energy Storage
Battery storage
100 MWWithdrawn / abandoned Bristol, MAISO-NE Nov 2017target 2021
Offshore Wind with battery addition
Other
75.0 MWWithdrawn / abandoned MAISO-NE Dec 2017target 2023
Wind
Onshore wind
65.6 MWWithdrawn / abandoned Oxford, MEISO-NE Apr 2017target 2020
Energy Storage
Battery storage
50.0 MWWithdrawn / abandoned Worcester, MAISO-NE Nov 2017target 2021
Repowering Increase
Gas
34.8 MWWithdrawn / abandoned Norfolk, MAISO-NE Apr 2017target 2021
Solar
Solar
30.0 MWWithdrawn / abandoned Cheshire, NHISO-NE Mar 2017target 2018
Solar
Solar
26.0 MWWithdrawn / abandoned Hartford, CTISO-NE Jul 2017target 2019
Gas turbine repowering
Gas
23.0 MWWithdrawn / abandoned Middlesex, CTISO-NE Apr 2017target 2022
Solar
Solar
22.0 MWWithdrawn / abandoned New London, CTISO-NE Jul 2017target 2019
Solar
Solar
20.1 MWWithdrawn / abandoned Franklin, VTISO-NE Apr 2017target 2018
Solar
Solar
20.1 MWWithdrawn / abandoned Franklin, VTISO-NE Apr 2017target 2019
Solar
Solar
20.1 MWWithdrawn / abandoned Orange, VTISO-NE Apr 2017target 2019
Solar
Solar
20.0 MWWithdrawn / abandoned Grafton, NHISO-NE Aug 2017target 2019
solar with battery
Solar + storage
20.0 MWWithdrawn / abandoned Worcester, MAISO-NE Sep 2017target 2020
Solar
Solar
20.0 MWWithdrawn / abandoned Coos, NHISO-NE Oct 2017target 2022
Solar
Solar
20.0 MWWithdrawn / abandoned Grafton, NHISO-NE Oct 2017target 2020
Solar
Solar
20.0 MWWithdrawn / abandoned Berkshire, MAISO-NE Oct 2017target 2021
Solar
Solar
20.0 MWWithdrawn / abandoned Grafton, NHISO-NE Aug 2017target 2022
Solar
Solar
20.0 MWWithdrawn / abandoned Windham, VTISO-NE Jul 2017target 2022
Claremont Solar
Solar
20.0 MWWithdrawn / abandoned Sullivan, NHISO-NE Aug 2017target 2023
Solar
Solar
20.0 MWWithdrawn / abandoned Grafton, NHISO-NE Oct 2017target 2020
wind
Onshore wind
20.0 MWWithdrawn / abandoned Franklin, VTISO-NE Jul 2017target 2020
Solar
Solar
20.0 MWWithdrawn / abandoned Hillsborough, NHISO-NE Aug 2017target 2022
Solar
Solar
20.0 MWWithdrawn / abandoned New Haven, CTISO-NE Mar 2017target 2018
Solar
Solar
20.0 MWWithdrawn / abandoned Grafton, NHISO-NE Aug 2017target 2019
CHP
Gas
8.0 MWWithdrawn / abandoned Coos, NHISO-NE Apr 2017target 2018
Solar
Solar
7.0 MWWithdrawn / abandoned Washington, RIISO-NE Nov 2017target 2020
Solar
Solar
6.1 MWWithdrawn / abandoned Washington, RIISO-NE Nov 2017target 2020
Project Increase
Other
2.2 MWWithdrawn / abandoned Hartford, CTISO-NE Apr 2017target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)