United States β€Ί Grid β€Ί Interconnection queues β€Ί Massachusetts

OFFSHORE WIND Β· ISO-NE

Offshore Wind

Offshore Wind is a 400 MW offshore wind request withdrawn in the ISO-NE interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2017 (completed)
  2. Withdrawn / abandonedFeb 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
701
Grid region
ISO-NE (New England)
Connection point (POI)
Brayton Point Substation in the Town of Somerset, Massachusetts or alternatively at Davisville Substation in the Town of North Kingstown, Rhode Island
Location
Massachusetts
Technology
Offshore Wind: 400 MW
Total requested
400 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 December 2017
Proposed online date
December 2023
Withdrawn
February 2019

Location

No county location in the queue data.

Power plants in Massachusetts Β· Transmission lines in Massachusetts

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem