United States β€Ί Grid β€Ί Interconnection queues β€Ί Connecticut

OTHER Β· ISO-NE

Project Increase

Project Increase is a 2.2 MW other request withdrawn in the ISO-NE interconnection queue, in Hartford County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2017 (completed)
  2. Withdrawn / abandonedNov 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
630
Grid region
ISO-NE (New England)
Connection point (POI)
Connecticut Light and Powers 13.8 kv Forestville 12A Substation
Location
Hartford County, Connecticut
Technology
Other: 2.2 MW
Total requested
2.2 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
5 April 2017
Proposed online date
September 2017
Withdrawn
November 2017

Location

No county location in the queue data.

Power plants in Connecticut Β· Transmission lines in Connecticut

Other requests in Hartford County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem