United States β€Ί Grid β€Ί Interconnection queues β€Ί Massachusetts

OTHER Β· ISO-NE

Offshore Wind w/ battery storage

Offshore Wind w/ battery storage is a 880 MW other request withdrawn in the ISO-NE interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2017 (completed)
  2. Withdrawn / abandonedJan 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
632
Grid region
ISO-NE (New England)
Connection point (POI)
Eversource, 115kV Bourne Substation, Barnstable County, Massachusetts
Location
Massachusetts
Technology
Offshore Wind: 880 MW Β· Battery
Total requested
880 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
5 April 2017
Proposed online date
December 2024
Withdrawn
January 2020

Location

No county location in the queue data.

Power plants in Massachusetts Β· Transmission lines in Massachusetts

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem