United States βΊ Grid βΊ Interconnection queues βΊ Massachusetts
OTHER Β· ISO-NEOffshore Wind w/ battery storage
Offshore Wind w/ battery storage is a 880 MW other request withdrawn in the ISO-NE interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2017 (completed)
- Withdrawn / abandonedJan 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 632
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Eversource, 115kV Bourne Substation, Barnstable County, Massachusetts
- Location
- Massachusetts
- Technology
- Offshore Wind: 880 MW Β· Battery
- Total requested
- 880 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 5 April 2017
- Proposed online date
- December 2024
- Withdrawn
- January 2020
Location
No county location in the queue data.
Power plants in Massachusetts Β· Transmission lines in Massachusetts
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem