United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in ISO-NE (New England) (2014 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Combined Cycle Gas |
837 MW | Withdrawn / abandoned |
| Wind Onshore wind |
601 MW | Withdrawn / abandoned |
| Wind Onshore wind |
601 MW | Withdrawn / abandoned |
| Simple Cycle Gas |
478 MW | Withdrawn / abandoned |
| Combined Cycle Gas |
388 MW | Withdrawn / abandoned |
| Gas Turbine (alt. to QP412) Gas |
335 MW | Withdrawn / abandoned |
| Wind Onshore wind |
250 MW | Withdrawn / abandoned |
| Combustion Turbine Other |
245 MW | Withdrawn / abandoned |
| Wind Onshore wind |
104 MW | Withdrawn / abandoned |
| wind Onshore wind |
104 MW | Withdrawn / abandoned |
| Wind Onshore wind |
104 MW | Withdrawn / abandoned |
| Wind Onshore wind |
104 MW | Withdrawn / abandoned |
| Wind Onshore wind |
104 MW | Withdrawn / abandoned |
| Gas Turbine Gas |
104 MW | Withdrawn / abandoned |
| Wind Onshore wind |
104 MW | Withdrawn / abandoned |
| Combined Cycle Gas |
100 MW | Withdrawn / abandoned |
| Wind Onshore wind |
85.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
73.5 MW | Withdrawn / abandoned |
| Wind Onshore wind |
52.8 MW | Withdrawn / abandoned |
| Gas Turbine Gas |
47.5 MW | Withdrawn / abandoned |
| Combined Cycle Increase Gas |
33.0 MW | Withdrawn / abandoned |
| Combined Cycle Increase Gas |
22.0 MW | Withdrawn / abandoned |
| Offshore Wind Offshore wind |
10.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
9.6 MW | Withdrawn / abandoned |
| Fuel Cell Gas |
5.6 MW | Withdrawn / abandoned |
| Hydro Hydro |
1.3 MW | Withdrawn / abandoned |
| Wind Increase (see Q452) Onshore wind |
0.8 MW | Withdrawn / abandoned |
| Potter Repowering Gas |
-21.2 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)77 Β· 22.8 GW
- PJM (Mid-Atlantic, Midwest)126 Β· 12.4 GW
- ERCOT (Texas)52 Β· 12.1 GW
- CAISO (California)70 Β· 10.2 GW
- West (non-ISO utilities)151 Β· 9,551 MW
- SPP (Southwest Power Pool)56 Β· 8,704 MW
- Southeast (non-ISO utilities)76 Β· 6,064 MW
- ISO-NE (New England)28 Β· 4,881 MW
- NYISO (New York)30 Β· 1,581 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)