United States β€Ί Grid β€Ί Interconnection queues β€Ί Connecticut

GAS Β· ISO-NE

Combined Cycle

Combined Cycle is a 100 MW gas request withdrawn in the ISO-NE interconnection queue, in Fairfield County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2014 (completed)
  2. Withdrawn / abandonedMay 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
451
Grid region
ISO-NE (New England)
Connection point (POI)
NU/CL&P Norwalk Harbor 115kV substation
Location
Fairfield County, Connecticut
Technology
Gas: 100 MW Β· Oil
Total requested
100 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
4 March 2014
Proposed online date
May 2018
Withdrawn
May 2014

Location

No county location in the queue data.

Power plants in Connecticut Β· Transmission lines in Connecticut

Other requests in Fairfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem