πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

ONSHORE WIND Β· ISO-NE

Wind

Wind is a 601 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Aroostook County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2014 (completed)
  2. Withdrawn / abandonedApr 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
471
Grid region
ISO-NE (New England)
Connection point (POI)
Primary: Orrington Substations 345kV with two alternatives: Keene Rd. Substation 345kV and the Orrington-Albion Rd 345kV line
Location
Aroostook County, Maine
Technology
Wind: 601 MW
Total requested
601 MW
Service type
Energy only (ERIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
19 June 2014
Proposed online date
December 2019
Withdrawn
April 2018

Location

Marker shows the centre of Aroostook County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Aroostook County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem