United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

ONSHORE WIND Β· ISO-NE

Wind

Wind is a 500 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Aroostook County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2022 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1211
Grid region
ISO-NE (New England)
Connection point (POI)
Orrington-Albion Rd 345kV line (3023) near the town of Pittsfield (approximately 19 miles from Albion Rd Substation)
Location
Aroostook County, Maine
Technology
Wind: 500 MW
Total requested
500 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
10 January 2022
Proposed online date
November 2026
Withdrawn
October 2025

Location

Marker shows the centre of Aroostook County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Aroostook County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem