United States βΊ Grid βΊ Interconnection queues βΊ Maine
ONSHORE WIND Β· ISO-NEWind
Wind is a 601 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Aroostook County, Maine.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2018 (completed)
- Withdrawn / abandonedFeb 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 734
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Primary: Orrington Substations 345kV with two alternatives: Keene Rd. Substation 345kV and the Orrington-Albion Rd 345kV line
- Location
- Aroostook County, Maine
- Technology
- Wind: 601 MW
- Total requested
- 601 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 12 April 2018
- Proposed online date
- December 2021
- Withdrawn
- February 2019
Location
Marker shows the centre of Aroostook County; the queue data does not give exact sites.
Other requests in Aroostook County
- Oakfield II Wind - Keene RoadOnshore wind Β· 136 MW Β· built
- WindOnshore wind Β· 905 MW Β· withdrawn
- WindOnshore wind Β· 630 MW Β· withdrawn
- WindOnshore wind Β· 601 MW Β· withdrawn
- WindOnshore wind Β· 601 MW Β· withdrawn
- WindOnshore wind Β· 601 MW Β· withdrawn
- WindOnshore wind Β· 500 MW Β· withdrawn
- WindOnshore wind Β· 500 MW Β· withdrawn
- WindOnshore wind Β· 376 MW Β· withdrawn
- SolarSolar Β· 319 MW Β· withdrawn
- SolarSolar Β· 300 MW Β· withdrawn
- Number Nine Wind FarmOnshore wind Β· 250 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem