United States βΊ Grid βΊ Interconnection queues βΊ Maine
SOLAR Β· ISO-NESolar
Solar is a 300 MW solar request withdrawn in the ISO-NE interconnection queue, in Aroostook County, Maine.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1243
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- 345kV line between Orrington(PSSE Bus Number: 100002) -Albion Rd (PSSE Bus Number: 100092) near the town of Pittsfield
- Location
- Aroostook County, Maine
- Technology
- Solar: 300 MW
- Total requested
- 300 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 31 March 2022
- Proposed online date
- November 2026
- Withdrawn
- October 2025
Location
Marker shows the centre of Aroostook County; the queue data does not give exact sites.
Other requests in Aroostook County
- Oakfield II Wind - Keene RoadOnshore wind Β· 136 MW Β· built
- WindOnshore wind Β· 905 MW Β· withdrawn
- WindOnshore wind Β· 630 MW Β· withdrawn
- WindOnshore wind Β· 601 MW Β· withdrawn
- WindOnshore wind Β· 601 MW Β· withdrawn
- WindOnshore wind Β· 601 MW Β· withdrawn
- WindOnshore wind Β· 601 MW Β· withdrawn
- WindOnshore wind Β· 500 MW Β· withdrawn
- WindOnshore wind Β· 500 MW Β· withdrawn
- WindOnshore wind Β· 376 MW Β· withdrawn
- SolarSolar Β· 319 MW Β· withdrawn
- Number Nine Wind FarmOnshore wind Β· 250 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem