United States β€Ί Grid β€Ί Interconnection queues β€Ί Massachusetts

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Massachusetts, ISO-NE

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown604,417 MW
Active in queue11.2 GW35 requests
Agreement signed6,013 MW17 requests
Withdrawn37048.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

60 requests Β· page 1 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Northfield Mt. Equipment Replacement
Battery storage
1,180 MWOperating Franklin, MAISO-NE Jun 2007target 2008
Footprint Combined Cycle Unit
Gas
716 MWOperating Essex, MAISO-NE Jan 2012target 2013
Canal 3
Gas
333 MWOperating Barnstable, MAISO-NE Mar 2014target 2019
Bear Swamp Pump Load increase
Battery storage
333 MWOperating Berkshire, MAISO-NE May 2022target 2023
Bear Swamp Pumping Load Increase
Battery storage
333 MWOperating Berkshire, MAISO-NE Nov 2021target 2021
Kendall Revised Reconfiguration Project
Gas
250 MWOperating Middlesex, MAISO-NE Oct 2015target 2016
Medway Peaker - SEMARI
Gas
208 MWOperating Norfolk, MAISO-NE May 2014target 2019
Altresco Increase (winter)
Gas
193 MWOperating Berkshire, MAISO-NE Feb 2011target 2012
Cranberry Point Energy Storage
Battery storage
150 MWOperating Plymouth, MAISO-NE Mar 2018target 2025
Thomas A. Watson Generating Station
Gas
108 MWOperating Norfolk, MAISO-NE Aug 2006target 2009
L'Energia
Gas
74.0 MWOperating Middlesex, MAISO-NE Jul 2007target 2009
Simple Cycle Gas Turbine
Gas
61.9 MWOperating Essex, MAISO-NE Jul 2016target 2024
Cogen DG
Gas
43.0 MWOperating Middlesex, MAISO-NE Oct 2016target 2021
MATEP (Medical Area Total Energy Project)
Gas
42.0 MWOperating Suffolk, MAISO-NE May 2006
Combined Cycle Uprate #2
Gas
30.0 MWOperating Worcester, MAISO-NE Feb 2015target 2018
Brayton Point 3 Uprate( see 243)
Coal
30.0 MWOperating Bristol, MAISO-NE Oct 2007target 2011
Hoosac Wind Project
Onshore wind
28.5 MWOperating Berkshire, MAISO-NE May 2003target 2012
Northfield Mt Upgrade #1
Battery storage
25.0 MWOperating Franklin, MAISO-NE Jan 2007target 2011
Crystal Lake Substation - NG Western MA Area Cluster Study
Solar
24.7 MWOperating Worcester, MAISO-NE Dec 2018target 2020
Dartmouth Power Expansion
Gas
24.0 MWOperating Bristol, MAISO-NE Jan 2007target 2009
Wendell Depot Substation - NG Western MA Area Cluster Study
Solar
15.0 MWOperating Franklin, MAISO-NE Dec 2018target 2021
Berkshire Wind Power Project
Onshore wind
15.0 MWOperating Berkshire, MAISO-NE Oct 2000target 2011
MATEP -3rd CTG
Gas
14.1 MWOperating Suffolk, MAISO-NE Jan 2013target 2017
Gas Turbine Increase
Gas
10.9 MWOperating Essex, MAISO-NE Feb 2013target 2013
Solar with Battery
Solar + storage
10.0 MWOperating Worcester, MAISO-NE Sep 2018target 2021
Harrington Street PV Project (QF)
Solar
9.8 MWOperating Worcester, MAISO-NE Sep 2011target 2016
Litchfield substation - NG Western MA Area Cluster Study
Solar
9.5 MWOperating Worcester, MAISO-NE Mar 2019target 2021
Solar
Solar
9.5 MWOperating Plymouth, MAISO-NE Jan 2018target 2019
N. Oxford Substation - NG Western MA Area Cluster Study
Solar
8.7 MWOperating Worcester, MAISO-NE Dec 2018target 2020
Solar
Solar
8.0 MWOperating Worcester, MAISO-NE Dec 2017target 2020
Salem Harbor Station Increase
Other
8.0 MWOperating Essex, MAISO-NE Dec 2010
Belchertown Substation - NG Western MA Area Cluster Study
Solar
8.0 MWOperating Hampden, MAISO-NE Dec 2018target 2021
Combined Reciprocating, Solar and Battery
Solar + storage
7.8 MWOperating Middlesex, MAISO-NE Aug 2018target 2019
Kendall #3 Back Pressure Steam Turbine
Gas
7.5 MWOperating Middlesex, MAISO-NE May 2010target 2010
Fitchburg Renewable Energy
Other
7.2 MWOperating Worcester, MAISO-NE May 2006target 2007
Solar
Solar
6.0 MWOperating Worcester, MAISO-NE Dec 2017target 2020
Increase to Steam Turbine Capacity Uprate (See QP
Coal
6.0 MWOperating Bristol, MAISO-NE Jan 2008target 2011
Kearsarge Solar with battery
Solar + storage
5.4 MWOperating Norfolk, MAISO-NE Aug 2018target 2021
Syncarpha Blandford Solar plus battery storage
Solar + storage
5.0 MWOperating Berkshire, MAISO-NE Sep 2020target 2021
Mass Power Increase
Gas
5.0 MWOperating Hampden, MAISO-NE Sep 2010target 2011
Holiday Hill Community Wind
Onshore wind
5.0 MWOperating Hampden, MAISO-NE Feb 2015target 2020
Dighton Power Uprate
Gas
5.0 MWOperating Bristol, MAISO-NE Sep 2012target 2013
Solar
Solar
4.9 MWOperating Plymouth, MAISO-NE Aug 2018target 2019
Westminster - NG Western MA Area Cluster Study
Solar
4.9 MWOperating Worcester, MAISO-NE Dec 2018target 2021
ENA Old Falmouth Road PV + Storage
Solar + storage
4.8 MWOperating Barnstable, MAISO-NE Apr 2020target 2024
Wilbraham substation - NG Western MA Area Cluster Study
Solar
4.0 MWOperating Hampden, MAISO-NE Mar 2019target 2020
Chestnut Hill 702 Substation - NG Western MA Area Cluster Study
Solar
3.3 MWOperating Worcester, MAISO-NE Dec 2018target 2020
Five Corners Substation - NG Western MA Area Cluster Study
Solar
3.0 MWOperating Hampshire, MAISO-NE Dec 2018target 2021
Leicester - NG Western MA Area Cluster Study
Solar
2.6 MWOperating Worcester, MAISO-NE Dec 2018target 2021
Bear Swamp Upper Yard substation - NG Western MA Area Cluster Study
Solar
2.5 MWOperating Berkshire, MAISO-NE Mar 2019target 2021
Page 1 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)