United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) (2016 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Staked Plains Wind 2 Onshore wind Β· Lincoln Clean |
454 MW | Withdrawn / abandoned |
| Duck Creek W Onshore wind Β· Terra-Gen |
400 MW | Withdrawn / abandoned |
| Sanco Solar Solar Β· 8minutenergy |
400 MW | Withdrawn / abandoned |
| Lake Spring Solar Solar Β· 8minutenergy |
400 MW | Withdrawn / abandoned |
| Zapata II W Onshore wind Β· Nextera |
400 MW | Withdrawn / abandoned |
| Lacy Creek W Onshore wind Β· Terra-Gen |
400 MW | Withdrawn / abandoned |
| Santa Rita Solar Solar Β· Invenergy |
400 MW | Withdrawn / abandoned |
| Blanco Canyon Wind Onshore wind Β· Invenergy |
251 MW | Withdrawn / abandoned |
| Soda Lake Solar 1 Solar Β· Arrington Solar |
203 MW | Withdrawn / abandoned |
| Darmstadt Onshore wind Β· RES Americas |
201 MW | Withdrawn / abandoned |
| Yellow Jacket Wind Onshore wind Β· RES Americas |
200 MW | Withdrawn / abandoned |
| Charbray Solar Solar Β· 8minutenergy |
200 MW | Withdrawn / abandoned |
| Shorthorn 2 Solar Solar Β· 8minutenergy |
200 MW | Withdrawn / abandoned |
| SP-Pecos Bend Solar A Solar Β· Solar Prime |
200 MW | Withdrawn / abandoned |
| Hubbard Wind Onshore wind Β· Nextera |
200 MW | Withdrawn / abandoned |
| Hariana Solar Solar Β· 8minutenergy |
200 MW | Withdrawn / abandoned |
| Byers Wind Onshore wind Β· Innergex |
200 MW | Withdrawn / abandoned |
| Shorthorn Solar Solar Β· 8minutenergy |
200 MW | Withdrawn / abandoned |
| Corriente Solar Solar Β· 8 Minute Energy |
200 MW | Withdrawn / abandoned |
| Ponwar Solar Farm Solar Β· 8minutenergy |
180 MW | Withdrawn / abandoned |
| SP-Pecos Bend Solar C Solar Β· Solar Prime |
180 MW | Withdrawn / abandoned |
| SP-Pecos Bend Solar B Solar Β· Solar Prime |
180 MW | Withdrawn / abandoned |
| Texana Solar Solar Β· Sunchase Power |
152 MW | Withdrawn / abandoned |
| Winkler Solar Solar Β· RES Americas |
150 MW | Withdrawn / abandoned |
| Bacon Switch Solar Solar Β· Sunchase Power |
150 MW | Withdrawn / abandoned |
| Greens Bayou Expansion II Gas Β· NRG |
149 MW | Withdrawn / abandoned |
| Bearkat Wind III Onshore wind Β· TriGlobal |
138 MW | Withdrawn / abandoned |
| Kaiser Creek Wind Onshore wind Β· Calpine |
102 MW | Withdrawn / abandoned |
| Bluegrove Wind Onshore wind Β· Innergex |
100 MW | Withdrawn / abandoned |
| Palestine Gas Β· Castleman Power |
100 MW | Withdrawn / abandoned |
| Burkburnett Solar Solar Β· Sunchase Power |
75.0 MW | Withdrawn / abandoned |
| Bluebonnet Solar Solar Β· One Energy Renewables |
60.7 MW | Withdrawn / abandoned |
| Elizabeth Battery Battery storage Β· Exelon |
50.0 MW | Withdrawn / abandoned |
| Ivory Solar C Solar Β· OCI Solar |
50.0 MW | Withdrawn / abandoned |
| Ivory Solar A Solar Β· OCI Solar |
50.0 MW | Withdrawn / abandoned |
| Ivory Solar B Solar Β· OCI Solar |
50.0 MW | Withdrawn / abandoned |
| Hallmark Solar Solar Β· Hallmark Solar, LLC |
43.0 MW | Withdrawn / abandoned |
| Comanche South Solar Solar Β· Lendlease Energy |
25.0 MW | Withdrawn / abandoned |
| Barclay BrEl PV Solar Β· SoCore Energy |
25.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)185 Β· 25.4 GW
- Southeast (non-ISO utilities)212 Β· 25.1 GW
- PJM (Mid-Atlantic, Midwest)250 Β· 23.8 GW
- West (non-ISO utilities)255 Β· 23.7 GW
- CAISO (California)96 Β· 19.6 GW
- SPP (Southwest Power Pool)110 Β· 19.5 GW
- ERCOT (Texas)39 Β· 7,318 MW
- ISO-NE (New England)22 Β· 4,400 MW
- NYISO (New York)25 Β· 2,046 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)