ONSHORE WIND Β· ERCOT

Staked Plains Wind 2

Staked Plains Wind 2 is a 454 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
18INR0025b
Grid region
ERCOT (Texas)
Developer
Lincoln Clean
Connection point (POI)
Longdraw 345kV radial
Technology
Wind: 454 MW
Total requested
454 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
14 March 2016
Proposed online date
May 2019

Location

No county location in the queue data.