Yellow Jacket Wind

Yellow Jacket Wind is a 200 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0008
Grid region
ERCOT (Texas)
Developer
RES Americas
Connection point (POI)
tap 345kV 7046 Kendal - 60618 Edison
Technology
Wind: 200 MW
Total requested
200 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
29 December 2016
Proposed online date
December 2019

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem