Shorthorn 2 Solar

Shorthorn 2 Solar is a 200 MW solar request withdrawn in the ERCOT interconnection queue, in Childress County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2016 (completed)
  2. Withdrawn / abandonedJun 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0005
Grid region
ERCOT (Texas)
Developer
8minutenergy
Connection point (POI)
60501 Tesla 345kV
Location
Childress County, Texas
Technology
Solar: 200 MW
Total requested
200 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
25 October 2016
Proposed online date
October 2020
Withdrawn
June 2019

Location

Marker shows the centre of Childress County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Childress County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem