United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· ERCOT

Blanco Canyon Wind

Blanco Canyon Wind is a 251 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Crosby County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2016 (completed)
  2. Withdrawn / abandonedOct 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
18INR0034
Grid region
ERCOT (Texas)
Developer
Invenergy
Connection point (POI)
59904 Cottonwood 345kV
Location
Crosby County, Texas
Technology
Wind: 251 MW
Total requested
251 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
20 July 2016
Proposed online date
December 2021
Withdrawn
October 2019

Location

Marker shows the centre of Crosby County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Crosby County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem