United States β€Ί Grid β€Ί Interconnection queues

ONSHORE WIND Β· ERCOT

Bearkat Wind III

Bearkat Wind III is a 138 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
18INR0054
Grid region
ERCOT (Texas)
Developer
TriGlobal
Connection point (POI)
59903 Bearkat 345kV
Technology
Wind: 138 MW
Total requested
138 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
20 December 2016
Proposed online date
June 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem