United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

SP-Pecos Bend Solar A

SP-Pecos Bend Solar A is a 200 MW solar request withdrawn in the ERCOT interconnection queue, in Pecos County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2016 (completed)
  2. Withdrawn / abandonedMar 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19INR0020
Grid region
ERCOT (Texas)
Developer
Solar Prime
Connection point (POI)
tap 345kV 76002 Bakersfield - 76005 SchneemanDr, ~ 11 mi E of Bakersfield.
Location
Pecos County, Texas
Technology
Solar: 200 MW
Total requested
200 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
25 October 2016
Proposed online date
February 2021
Withdrawn
March 2020

Location

Marker shows the centre of Pecos County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Pecos County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem