United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· ERCOT

Darmstadt

Darmstadt is a 201 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Schleicher County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2016 (completed)
  2. Withdrawn / abandonedJul 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
18INR0023
Grid region
ERCOT (Texas)
Developer
RES Americas
Connection point (POI)
tap 345kV 60708 Orsted 345kV - 76003 Big Hill
Location
Schleicher County, Texas
Technology
Wind: 201 MW
Total requested
201 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
6 June 2016
Proposed online date
December 2021
Withdrawn
July 2019

Location

Marker shows the centre of Schleicher County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Schleicher County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem