Withdrawn queue requests in CAISO (California) (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6511.3 GW
Active in queue8,678 MW17 requests
Agreement signed8,678 MW17 requests
Withdrawn6511.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

65 requests Β· page 1 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Harquahala Flats
Solar + storage
900 MWWithdrawn / abandoned Maricopa, AZCAISO May 2017target 2022
Mesaville Solar
Solar + storage
706 MWWithdrawn / abandoned Riverside, CACAISO May 2017target 2022
Panoche Energy Center
Gas
432 MWWithdrawn / abandoned Fresno, CACAISO Dec 2017target 2018
Westside Canal Energy Center
Solar + storage
425 MWWithdrawn / abandoned Imperial, CACAISO May 2017target 2021
Creosote
Solar
419 MWWithdrawn / abandoned Kern, CACAISO May 2017target 2021
Golden Square
Solar + storage
410 MWWithdrawn / abandoned Fresno, CACAISO May 2017target 2021
Canella 2 Solar Farm
Solar + storage
400 MWWithdrawn / abandoned Kern, CACAISO May 2017target 2020
Sourgrass Solar
Solar
380 MWWithdrawn / abandoned Tehama, CACAISO May 2017target 2020
Ventura Energy Center
Gas
326 MWWithdrawn / abandoned Ventura, CACAISO May 2017target 2020
Wardenclyffe
Battery storage
314 MWWithdrawn / abandoned Alameda, CACAISO May 2017target 2022
Harquahala Sun
Solar + storage
313 MWWithdrawn / abandoned Maricopa, AZCAISO May 2017target 2020
Hidden Hills Solar 1
Solar
306 MWWithdrawn / abandoned Inyo, CACAISO May 2017target 2021
Vision Wind
Onshore wind
281 MWWithdrawn / abandoned Kern, CACAISO May 2017target 2023
Longspur 10
Solar
264 MWWithdrawn / abandoned Kern, CACAISO May 2017target 2021
Dasos 10
Solar
210 MWWithdrawn / abandoned Merced, CACAISO May 2017target 2020
Perseus Solar
Solar
209 MWWithdrawn / abandoned Merced, CACAISO May 2017target 2021
Romero Creek Solar
Solar
204 MWWithdrawn / abandoned Merced, CACAISO May 2017target 2022
Vermillion Energy Storage
Battery storage
204 MWWithdrawn / abandoned Riverside, CACAISO May 2017target 2023
Vanguard Solar BESS
Solar + storage
200 MWWithdrawn / abandoned Fresno, CACAISO May 2017target 2025
Lotus 2 Solar Farm
Solar + storage
200 MWWithdrawn / abandoned Madera, CACAISO May 2017target 2020
Goldwick Solar Farm
Solar + storage
200 MWWithdrawn / abandoned Stanislaus, CACAISO May 2017target 2020
Calhawk Solar Farm
Solar + storage
200 MWWithdrawn / abandoned Tulare, CACAISO May 2017target 2022
Darlington Balley Solar Energy 1
Solar + storage
185 MWWithdrawn / abandoned Maricopa, AZCAISO May 2017target 2024
Munz Solar 1
Solar + storage
180 MWWithdrawn / abandoned Los Angeles, CACAISO May 2017target 2020
Wistaria Solar 2
Solar
156 MWWithdrawn / abandoned Imperial, CACAISO May 2017target 2019
American Kings 10
Solar
156 MWWithdrawn / abandoned Fresno, CACAISO May 2017target 2021
West Springs 2 Wind Farm
Onshore wind
155 MWWithdrawn / abandoned Riverside, CACAISO May 2017target 2023
Sun Streams Solar 3
Solar
155 MWWithdrawn / abandoned Maricopa, AZCAISO May 2017target 2020
Quartzite 10
Solar
155 MWWithdrawn / abandoned Riverside, CACAISO May 2017target 2023
East-Bay-Wind
Onshore wind
153 MWWithdrawn / abandoned Alameda, CACAISO May 2017target 2023
King Flat Wind Farm 1
Onshore wind
152 MWWithdrawn / abandoned Yolo, CACAISO May 2017target 2020
Firehawk Solar 1
Solar + storage
150 MWWithdrawn / abandoned Kern, CACAISO May 2017target 2020
Exchequer
Hydro
112 MWWithdrawn / abandoned Mariposa, CACAISO May 2017target 2019
Blue Mountain Wind
Onshore wind
108 MWWithdrawn / abandoned Los Angeles, CACAISO May 2017target 2020
Puerta Renewable Energy Reliability Center
Solar + storage
105 MWWithdrawn / abandoned Fresno, CACAISO May 2017target 2019
Sage Solar
Solar
103 MWWithdrawn / abandoned Alameda, CACAISO May 2017target 2020
Las Camas 2
Solar
103 MWWithdrawn / abandoned Merced, CACAISO May 2017target 2021
Kerrness Solar
Solar
102 MWWithdrawn / abandoned Merced, CACAISO May 2017target 2021
Rubita
Solar
102 MWWithdrawn / abandoned San Bernardino, CACAISO May 2017target 2023
Oakland Energy Reliability Center
Battery storage
102 MWWithdrawn / abandoned Alameda, CACAISO May 2017target 2019
King Flat Wind Farm 2
Onshore wind
102 MWWithdrawn / abandoned Yolo, CACAISO May 2017target 2020
Gabriel Solar 3
Solar
100 MWWithdrawn / abandoned San Bernardino, CACAISO May 2017target 2019
Chanson Energy Storage Facility
Battery storage
100 MWWithdrawn / abandoned Calaveras, CACAISO May 2017target 2020
Kroe Hybrid
Solar + storage
100 MWWithdrawn / abandoned Merced, CACAISO May 2017target 2019
Wilbur Energy Storage
Battery storage
94.5 MWWithdrawn / abandoned Contra Costa, CACAISO May 2017target 2023
Mallard Energy Storage Project
Battery storage
90.0 MWWithdrawn / abandoned Contra Costa, CACAISO May 2017target 2021
Vickers Energy Storage
Battery storage
80.0 MWWithdrawn / abandoned Los Angeles, CACAISO May 2017target 2021
Cassiopeia Solar
Solar
77.0 MWWithdrawn / abandoned Kern, CACAISO May 2017target 2021
Curry Solar
Solar
71.5 MWWithdrawn / abandoned Fresno, CACAISO May 2017target 2020
Warren Solar 1
Solar
71.5 MWWithdrawn / abandoned Nye, NVCAISO May 2017target 2020
Page 1 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)