Mallard Energy Storage Project

Mallard Energy Storage Project is a 90.0 MW battery storage request withdrawn in the CAISO interconnection queue, in Contra Costa County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandonedJun 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1386
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Pittsburg Switchyard 230kV
Location
Contra Costa County, California
Technology
Battery: 90.0 MW
Total requested
90.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
1 May 2017
Proposed online date
June 2021
Withdrawn
June 2017

Location

Marker shows the centre of Contra Costa County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Contra Costa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem