East-Bay-Wind

East-Bay-Wind is a 153 MW onshore wind request withdrawn in the CAISO interconnection queue, in Alameda County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandonedMay 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1354
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Tesla Substation 230kV
Location
Alameda County, California
Technology
Wind: 153 MW
Total requested
153 MW
Service type
Energy only (ERIS)
Study phase
In Progress
Queue status
Withdrawn
Entered queue
1 May 2017
Proposed online date
February 2023
Withdrawn
May 2021

Location

Marker shows the centre of Alameda County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Alameda County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem