SOLAR + STORAGE · CAISO

Vanguard Solar BESS

Vanguard Solar BESS is a 200 MW solar + storage request withdrawn in the CAISO interconnection queue, in Fresno County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandonedDec 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1385
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Mustang Switching Station 230 kV
Location
Fresno County, California
Technology
Solar: 153 MW · Battery: 47.0 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 May 2017
Proposed online date
March 2025
Withdrawn
December 2019

Location

Marker shows the centre of Fresno County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Fresno County