Exchequer is a 112 MW hydro request withdrawn in the CAISO interconnection queue, in Mariposa County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2017 (completed)
- Withdrawn / abandonedMay 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1355
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Exchequer-LeGrand 115 kV
- Location
- Mariposa County, California
- Technology
- Hydro: 112 MW
- Total requested
- 112 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 1 May 2017
- Proposed online date
- May 2019
- Withdrawn
- May 2017
Location
Marker shows the centre of Mariposa County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem