Hidden Hills Solar 1

Hidden Hills Solar 1 is a 306 MW solar request withdrawn in the CAISO interconnection queue, in Inyo County, California, connecting to GLW.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandonedApr 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1400
Grid region
CAISO (California)
Utility / transmission owner
GLW
Connection point (POI)
Crazy Eyes Switching Station 230kV
Location
Inyo County, California
Technology
Solar: 306 MW
Total requested
306 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 May 2017
Proposed online date
December 2021
Withdrawn
April 2018

Location

Marker shows the centre of Inyo County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Inyo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem