United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· WEST

Solar project Q20, Inyo County

Solar project Q20, Inyo County is a 138 MW solar request withdrawn in the West interconnection queue, in Inyo County, California, connecting to Los Angeles Department of Water and Power.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2011 (completed)
  2. Withdrawn / abandonedApr 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q20
Grid region
West (non-ISO utilities)
Utility / transmission owner
Los Angeles Department of Water and Power
Connection point (POI)
Owens Gorge - Rinaldi 230kV Line
Location
Inyo County, California
Technology
Solar: 138 MW
Total requested
138 MW
Queue status
Withdrawn
Entered queue
3 October 2011
Proposed online date
November 2014
Withdrawn
April 2015

Location

Marker shows the centre of Inyo County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Inyo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem