United States › Grid › Interconnection queues › California

ONSHORE WIND · CAISO

West Springs 2 Wind Farm

West Springs 2 Wind Farm is a 155 MW onshore wind request withdrawn in the CAISO interconnection queue, in Riverside County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandonedOct 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1410
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Devers-Vista #1 230kV
Location
Riverside County, California
Technology
Wind: 155 MW
Total requested
155 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 May 2017
Proposed online date
October 2023
Withdrawn
October 2019

Location

Marker shows the centre of Riverside County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Riverside County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem