United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Sourgrass Solar

Sourgrass Solar is a 380 MW solar request withdrawn in the CAISO interconnection queue, in Tehama County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandonedMar 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1364
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Cottonwood-Delevan #1 230kV
Location
Tehama County, California
Technology
Solar: 380 MW
Total requested
380 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 May 2017
Proposed online date
December 2020
Withdrawn
March 2018

Location

Marker shows the centre of Tehama County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Tehama County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem