United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Stony Creek Storage

Stony Creek Storage is a 252 MW battery storage request withdrawn in the CAISO interconnection queue, in Tehama County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedAug 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1863
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Cottonwood-Delevan #1 and #2 230 kV
Location
Tehama County, California
Technology
Battery: 252 MW
Total requested
252 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
July 2031
Withdrawn
August 2025

Location

Marker shows the centre of Tehama County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Tehama County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem