King Flat Wind Farm 2

King Flat Wind Farm 2 is a 102 MW onshore wind request withdrawn in the CAISO interconnection queue, in Yolo County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandonedMar 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1358
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Delevan-Vaca No. 2& No. 3 230kV
Location
Yolo County, California
Technology
Wind: 102 MW
Total requested
102 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 May 2017
Proposed online date
June 2020
Withdrawn
March 2018

Location

Marker shows the centre of Yolo County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Yolo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem