United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Woodland Battery Project

Woodland Battery Project is a 25.0 MW battery storage request withdrawn in the CAISO interconnection queue, in Yolo County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2015 (completed)
  2. Withdrawn / abandonedMay 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1094
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
115kV tap on Woodland-Davis 115kV line
Location
Yolo County, California
Technology
Battery: 25.0 MW
Total requested
25.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
26 March 2015
Proposed online date
September 2017
Withdrawn
May 2016

Location

Marker shows the centre of Yolo County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Yolo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem