United States › Grid › Interconnection queues › California
GAS · CAISOWellhead Power Woodland CHP
Wellhead Power Woodland CHP is a 49.0 MW gas request withdrawn in the CAISO interconnection queue, in Yolo County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2012 (completed)
- Withdrawn / abandonedAug 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 935
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Woodland-Davis 115kV line
- Location
- Yolo County, California
- Technology
- Gas: 49.0 MW
- Total requested
- 49.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 2 April 2012
- Proposed online date
- April 2014
- Withdrawn
- August 2012
Location
Marker shows the centre of Yolo County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Yolo County
- Conaway Hybrid Power PlantSolar + storage · 170 MW · in study
- South WillowSolar · 413 MW · withdrawn
- DunniganOnshore wind · 301 MW · withdrawn
- Berryessa Wind FarmOnshore wind · 158 MW · withdrawn
- King Flat Wind Farm 1Onshore wind · 152 MW · withdrawn
- King Flat Wind Farm 2Onshore wind · 102 MW · withdrawn
- Dunnigan HillsOnshore wind · 100 MW · withdrawn
- Wellhead Power WintersGas · 49.0 MW · withdrawn
- Zamora SolarSolar · 30.0 MW · withdrawn
- Woodland Battery ProjectBattery storage · 25.0 MW · withdrawn
- Apparent First HybridSolar + storage · 24.1 MW · withdrawn
- Plainfield SolarSolar · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem