United States β€Ί Grid β€Ί Interconnection queues β€Ί California

GAS Β· CAISO

Wellhead Power Winters

Wellhead Power Winters is a 49.0 MW gas request withdrawn in the CAISO interconnection queue, in Yolo County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2008 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
351
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Tap Vaca-Rio Oso 115 kV line
Location
Yolo County, California
Technology
Gas: 49.0 MW
Total requested
49.0 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
25 April 2008
Proposed online date
July 2009
Withdrawn
November 2008

Location

Marker shows the centre of Yolo County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Yolo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem