United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Apparent First Hybrid

Apparent First Hybrid is a 24.1 MW solar + storage request withdrawn in the CAISO interconnection queue, in Yolo County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2010 (completed)
  2. Withdrawn / abandonedApr 2025 (project stopped here)
  3. ConsentedMar 2014 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
653F
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Woodland-Davis 115 kV Line
Location
Yolo County, California
Technology
Solar: 12.0 MW · Battery: 12.1 MW
Total requested
24.1 MW
Service type
Energy only (ERIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
13 October 2010
Agreement signed
28 March 2014
Proposed online date
May 2022
Withdrawn
April 2025

Location

Marker shows the centre of Yolo County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Yolo County