United States βΊ Grid βΊ Interconnection queues βΊ California
SOLAR Β· CAISOSouth Willow
South Willow is a 413 MW solar request withdrawn in the CAISO interconnection queue, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2023 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 54802
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- RIO OSO 230 kV
- Location
- California
- Technology
- Solar: 413 MW
- Total requested
- 413 MW
- Service type
- Energy only (ERIS)
- Study phase
- Caiso Cluster 15 Unvalidated
- Queue status
- Withdrawn
- Entered queue
- 17 April 2023
- Proposed online date
- December 2030
- Withdrawn
- December 2024
Location
Marker shows the centre of County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in County
- Conaway Hybrid Power PlantSolar + storage Β· 170 MW Β· in study
- DunniganOnshore wind Β· 301 MW Β· withdrawn
- Berryessa Wind FarmOnshore wind Β· 158 MW Β· withdrawn
- King Flat Wind Farm 1Onshore wind Β· 152 MW Β· withdrawn
- King Flat Wind Farm 2Onshore wind Β· 102 MW Β· withdrawn
- Dunnigan HillsOnshore wind Β· 100 MW Β· withdrawn
- Wellhead Power WintersGas Β· 49.0 MW Β· withdrawn
- Wellhead Power Woodland CHPGas Β· 49.0 MW Β· withdrawn
- Zamora SolarSolar Β· 30.0 MW Β· withdrawn
- Woodland Battery ProjectBattery storage Β· 25.0 MW Β· withdrawn
- Apparent First HybridSolar + storage Β· 24.1 MW Β· withdrawn
- Plainfield SolarSolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem