🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

ONSHORE WIND · CAISO

Berryessa Wind Farm

Berryessa Wind Farm is a 158 MW onshore wind request withdrawn in the CAISO interconnection queue, in Yolo County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedMay 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1267
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Madison 115 kV
Location
Yolo County, California
Technology
Wind: 158 MW
Total requested
158 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 May 2016
Proposed online date
December 2019
Withdrawn
May 2017

Location

Marker shows the centre of Yolo County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Yolo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem