Conaway Hybrid Power Plant

Conaway Hybrid Power Plant is a 170 MW solar + storage request in interconnection study in the CAISO interconnection queue, in Yolo County, California, connecting to PGAE.

Queue statusIn planning
  1. PlanningQueued Apr 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jan 2023 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
1687
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Woodland-Davis 115 kV Line
Location
Yolo County, California
Technology
Solar: 85.0 MW · Battery: 84.8 MW
Total requested
170 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Active
Entered queue
15 April 2020
Proposed online date
January 2023

Location

Marker shows the centre of Yolo County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Yolo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem