GAS Β· CAISO

Ventura Energy Center

Ventura Energy Center is a 326 MW gas request withdrawn in the CAISO interconnection queue, in Ventura County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandonedMar 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1425
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Santa Clara Substation 230kV
Location
Ventura County, California
Technology
Gas: 300 MW Β· Battery: 26.1 MW
Total requested
326 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 May 2017
Proposed online date
October 2020
Withdrawn
March 2018

Location

Marker shows the centre of Ventura County; the queue data does not give exact sites.