BATTERY STORAGE · CAISO

Edison Drive Energy Storage

Edison Drive Energy Storage is a 672 MW battery storage request withdrawn in the CAISO interconnection queue, in Ventura County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedAug 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2087
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Moorpark Substation 230 kV
Location
Ventura County, California
Technology
Battery: 672 MW
Total requested
672 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
January 2024
Withdrawn
August 2022

Location

Marker shows the centre of Ventura County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Ventura County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem