United States βΊ Grid βΊ Interconnection queues βΊ California
GAS Β· CAISOVentura Clean Energy
Ventura Clean Energy is a 778 MW gas request withdrawn in the CAISO interconnection queue, in Ventura County, California, connecting to SCE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2013 (completed)
- Withdrawn / abandonedFeb 2014 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 977
- Grid region
- CAISO (California)
- Utility / transmission owner
- SCE
- Connection point (POI)
- Santa Clara Substation 230kV bus
- Location
- Ventura County, California
- Technology
- Gas: 778 MW
- Total requested
- 778 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 30 April 2013
- Proposed online date
- June 2019
- Withdrawn
- February 2014
Location
Marker shows the centre of Ventura County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in Ventura County
- Drifter Energy StorageBattery storage Β· 505 MW Β· agreement signed
- Goldback Solar CenterBattery storage Β· 500 MW Β· agreement signed
- Shoals Energy StorageBattery storage Β· 409 MW Β· agreement signed
- Rosa StorageBattery storage Β· 512 MW Β· in study
- Edison Drive Energy StorageBattery storage Β· 672 MW Β· withdrawn
- Gwent Storage 2Battery storage Β· 473 MW Β· withdrawn
- Mission RockGas Β· 326 MW Β· withdrawn
- Ventura Energy CenterGas Β· 326 MW Β· withdrawn
- Mission Rock Energy Center (Fka Mission Rock Energy Center Flex)Gas Β· 305 MW Β· withdrawn
- MichelangeloBattery storage Β· 205 MW Β· withdrawn
- WP Goleta (Fka WP Oxnard)Gas Β· 200 MW Β· withdrawn
- Dupont StorageBattery storage Β· 159 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem