OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) (2016 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Heartland Solar-2 Solar |
1,045 MW | Withdrawn / abandoned |
| Heartland Solar Solar |
1,045 MW | Withdrawn / abandoned |
| California City Solar Solar |
732 MW | Withdrawn / abandoned |
| Gigantes Solar Solar |
730 MW | Withdrawn / abandoned |
| Copper Rays Solar |
722 MW | Withdrawn / abandoned |
| Waller Solar Farm Solar + storage |
615 MW | Withdrawn / abandoned |
| Canella Solar Farm Solar + storage |
610 MW | Withdrawn / abandoned |
| Arizona Mohave Solar Solar |
521 MW | Withdrawn / abandoned |
| Harquahala Solar Solar |
519 MW | Withdrawn / abandoned |
| Creekside Battery storage |
418 MW | Withdrawn / abandoned |
| All American Solar Solar |
415 MW | Withdrawn / abandoned |
| Grapevine 1 Battery storage |
406 MW | Withdrawn / abandoned |
| Linwood Solar Farm Solar + storage |
405 MW | Withdrawn / abandoned |
| Signal Peak Solar |
400 MW | Withdrawn / abandoned |
| Southland Solar |
380 MW | Withdrawn / abandoned |
| Mission Rock Gas |
326 MW | Withdrawn / abandoned |
| Pelican Island Solar |
311 MW | Withdrawn / abandoned |
| Century Solar Solar |
310 MW | Withdrawn / abandoned |
| Sand Solar Solar |
309 MW | Withdrawn / abandoned |
| Clover Energy Storage Plant Battery storage |
300 MW | Withdrawn / abandoned |
| Eon Vision Wind Onshore wind |
281 MW | Withdrawn / abandoned |
| Copper MTN Solar 5 Solar + storage |
277 MW | Withdrawn / abandoned |
| Golden Evening Solar Solar |
265 MW | Withdrawn / abandoned |
| Rosy 9 Solar |
260 MW | Withdrawn / abandoned |
| Ig Tehama Solar Solar |
253 MW | Withdrawn / abandoned |
| Helios Secondus Solar |
232 MW | Withdrawn / abandoned |
| Barstow Solar 1 Solar |
211 MW | Withdrawn / abandoned |
| Re Prism Solar |
209 MW | Withdrawn / abandoned |
| Mount Laguna Wind Onshore wind |
208 MW | Withdrawn / abandoned |
| Coso Solar 2 Solar |
207 MW | Withdrawn / abandoned |
| Rolling Hills Solar Solar |
206 MW | Withdrawn / abandoned |
| Romero Creek Wind + storage |
206 MW | Withdrawn / abandoned |
| South Ridge Solar |
205 MW | Withdrawn / abandoned |
| Ghost Town Solar Solar |
205 MW | Withdrawn / abandoned |
| Red Wing Ranch Solar Solar |
205 MW | Withdrawn / abandoned |
| Blue Wing Ranch Solar Solar |
205 MW | Withdrawn / abandoned |
| LH Energy Storage Battery storage |
204 MW | Withdrawn / abandoned |
| Seis Puntos Solar Solar |
203 MW | Withdrawn / abandoned |
| Gateway Energy Storage 2 Battery storage |
200 MW | Withdrawn / abandoned |
| Hudson Solar 1 Solar + storage |
186 MW | Withdrawn / abandoned |
| High Desert View Solar Project Solar + storage |
167 MW | Withdrawn / abandoned |
| West Springs Wind Farm Onshore wind |
158 MW | Withdrawn / abandoned |
| Berryessa Wind Farm Onshore wind |
158 MW | Withdrawn / abandoned |
| Surya Solar Solar |
158 MW | Withdrawn / abandoned |
| Alamo Springs Solar 3 Solar |
158 MW | Withdrawn / abandoned |
| Quartz 9 Solar |
154 MW | Withdrawn / abandoned |
| Arroyo Reyes Solar Solar |
153 MW | Withdrawn / abandoned |
| Yellow Pine 1 Solar |
153 MW | Withdrawn / abandoned |
| Golden Rectangle Solar + storage |
153 MW | Withdrawn / abandoned |
| Walker Ridge Onshore wind |
145 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)185 Β· 25.4 GW
- Southeast (non-ISO utilities)212 Β· 25.1 GW
- PJM (Mid-Atlantic, Midwest)250 Β· 23.8 GW
- West (non-ISO utilities)255 Β· 23.7 GW
- CAISO (California)96 Β· 19.6 GW
- SPP (Southwest Power Pool)110 Β· 19.5 GW
- ERCOT (Texas)39 Β· 7,318 MW
- ISO-NE (New England)22 Β· 4,400 MW
- NYISO (New York)25 Β· 2,046 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)