United States › Grid › Interconnection queues › Nevada

SOLAR + STORAGE · CAISO

Copper MTN Solar 5

Copper MTN Solar 5 is a 277 MW solar + storage request withdrawn in the CAISO interconnection queue, in Clark County, Nevada, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedApr 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1338
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
SCE owned Eldorado bus 230kV
Location
Clark County, Nevada
Technology
Solar: 257 MW · Battery: 20.0 MW
Total requested
277 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 May 2016
Proposed online date
April 2023
Withdrawn
April 2017

Location

Marker shows the centre of Clark County; the queue data does not give exact sites.

Power plants in Nevada · Transmission lines in Nevada

Other requests in Clark County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem