BATTERY STORAGE · CAISO

Gateway Energy Storage 2

Gateway Energy Storage 2 is a 200 MW battery storage request withdrawn in the CAISO interconnection queue, in San Diego County, California, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedJul 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1290
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Otay Mesa substation 230 kV
Location
San Diego County, California
Technology
Battery: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
2 May 2016
Proposed online date
August 2019
Withdrawn
July 2016

Location

Marker shows the centre of San Diego County; the queue data does not give exact sites.