United States › Grid › Interconnection queues › California

ONSHORE WIND · CAISO

Mount Laguna Wind

Mount Laguna Wind is a 208 MW onshore wind request withdrawn in the CAISO interconnection queue, in San Diego County, California, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedMay 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1287
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Suncrest - Ocotillo 500 kV line
Location
San Diego County, California
Technology
Wind: 208 MW
Total requested
208 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 May 2016
Proposed online date
December 2023
Withdrawn
May 2018

Location

Marker shows the centre of San Diego County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Diego County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem