WIND + STORAGE Β· CAISO

Romero Creek

Romero Creek is a 206 MW wind + storage request withdrawn in the CAISO interconnection queue, in Merced County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedOct 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1246
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Quinto Switching Station 230 kV Bus
Location
Merced County, California
Technology
Wind: 178 MW Β· Battery: 28.0 MW
Total requested
206 MW
Service type
Network resource (NRIS)
Study phase
In Progress
Queue status
Withdrawn
Entered queue
2 May 2016
Proposed online date
April 2023
Withdrawn
October 2019

Location

Marker shows the centre of Merced County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Merced County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem