United States β€Ί Grid β€Ί Interconnection queues β€Ί Nevada

SOLAR Β· CAISO

Yellow Pine 1

Yellow Pine 1 is a 153 MW solar request withdrawn in the CAISO interconnection queue, in Clark County, Nevada, connecting to VEA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedJun 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1340
Grid region
CAISO (California)
Utility / transmission owner
VEA
Connection point (POI)
VEA Sandy Valley 138 kV
Location
Clark County, Nevada
Technology
Solar: 153 MW
Total requested
153 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
2 May 2016
Proposed online date
December 2019
Withdrawn
June 2016

Location

Marker shows the centre of Clark County; the queue data does not give exact sites.

Power plants in Nevada Β· Transmission lines in Nevada

Other requests in Clark County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem