United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Quartz 9

Quartz 9 is a 154 MW solar request withdrawn in the CAISO interconnection queue, in Riverside County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedMar 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1297
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Colorado River 230 kV SUB
Location
Riverside County, California
Technology
Solar: 154 MW
Total requested
154 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
2 May 2016
Proposed online date
December 2021
Withdrawn
March 2017

Location

Marker shows the centre of Riverside County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Riverside County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem