United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESCompleted queue projects in Texas — page 6
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| North Fork Energy Storage Other · North Fork Energy Storage |
101 MW | |
| Bat Cave Energy Storage Other · Bat Cave Energy Storage |
101 MW | |
| Eliza Storage Other · Ables Springs Storage, LLC |
100 MW | |
| St. Gall II Energy Storage Battery storage · St. Gall Energy Storage LLC |
100 MW | |
| Lapetus Solar Solar · Lapetus Energy Project, LLC |
100 MW | |
| Lignin (SJRR) Gas · SJRR Power LLC |
100 MW | |
| Old Bloomington Road Gas · Castleman Power |
100 MW | |
| Aquilla Lake 2 Wind Onshore wind · NextEra Energy |
100 MW | |
| CityVict Gas · Castleman Power |
100 MW | |
| West of Pecos Solar Solar · Eon |
100 MW | |
| VictPort Gas · Castleman Power |
100 MW | |
| Blue Summit II Wind + storage · Nextera |
99.4 MW | |
| Coral Storage Other · Copperhead Solar, LLC |
99.0 MW | |
| Anchor Wind Onshore wind · Ranchland Wind Project,LLC |
98.9 MW | |
| Tavener 2 Solar |
98.0 MW | |
| Hudson (Ineos/Brazoria) Gas · Ineos |
96.0 MW | |
| Texas Gulf Sulphur 1, TGS_GT01 Gas |
94.0 MW | |
| Sand Bluff Wind Repower Onshore wind |
89.5 MW | |
| Odessa-Ector Unit 2 (Block 2) Uprate Repower Gas |
83.0 MW | |
| Phoenix Solar Solar · G.S.E. ONE LLC |
82.3 MW | |
| Ellis Solar Solar · Ellis Solar, LLC |
81.0 MW | |
| Onshore wind project GEN-2011-025, Crosby County Onshore wind |
80.0 MW | |
| Odessa-Ector Unit 1 (Block 1) Uprate Gas · LA FRONTERA HOLDINGS LLC |
80.0 MW | |
| Dogfish BESS Battery storage · Dogfish ESS Assets, LLC |
78.2 MW | |
| Longbow Solar Solar · Longbow Solar, LLC |
78.2 MW | |
| Colorado Bend I Expansion Gas · Colorado Bend I Power, LLC |
78.0 MW | |
| Azure Sky BESS Other · Azure Sky Solar Project, LLC |
77.6 MW | |
| V2 Brooks Field DGR Other · Life Cycle Power |
76.5 MW | |
| Antlia BESS Battery storage · BRP Antlia BESS LLC |
72.4 MW | |
| Stampede BESS Other · Stampede Solar Project, LLC |
72.4 MW | |
| Fence Post BESS Other · Fence Post Solar Project, LLC |
72.2 MW | |
| Anchor BESS Other · Ranchland Wind Project,LLC |
71.5 MW | |
| Dileo Solar Solar · Elawan Dileo Solar LLC |
71.4 MW | |
| Mustang Creek Storage Other · Ganado Solar, LLC |
70.5 MW | |
| Onshore wind project GEN-2002-009, Hansford County Onshore wind |
67.2 MW | |
| House Mountain Other · House Mountain LLC |
63.0 MW | |
| Noble Storage (BESS1) Other |
62.5 MW | |
| Noble Storage Other · BT NOBLE SOLAR, LLC |
62.5 MW | |
| Onshore wind project GEN-2012-001, Lynn County Onshore wind |
61.2 MW | |
| XE Murat [Adlong] Solar Solar · Liberty 1 Solar |
60.4 MW | |
| XE Murat [Adlong] Storage Battery storage · Liberty 1 Solar LLC |
60.1 MW | |
| Z0 Beck Road DGR Other · Life Cycle Power |
60.0 MW | |
| Kellam Solar Solar · BT Kellam Solar, LLC |
59.8 MW | |
| Rippey Solar Solar · BT Cooke Solar, LLC |
59.8 MW | |
| Cross Trails Storage Battery storage · Cross Trails Energy Storage Project, LLC |
58.3 MW | |
| Signal Solar Solar |
51.8 MW | |
| Republic Road Storage Other · KCE TX 11, LLC |
51.8 MW | |
| Lily Storage Other · Lily Solar, LLC |
51.7 MW | |
| Blue Jay BESS Other · Blue Jay Solar I, LLC |
51.6 MW | |
| Roseland Storage Other · Enel Green Power Roseland Solar, LLC |
51.6 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)397 · 53.8 GW
- SPP (Southwest Power Pool)30 · 4,859 MW
- MISO (Midcontinent)3 · 1,246 MW
- West (non-ISO utilities)1 · 420 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)